What this is
Mechanical room fit drawings
Need a clear equipment-room / mechanical-room layout for a boiler or hydronic package?
Upload the floor plan or mech-room plan and Div 23 schedules. You get a layout / fit
review ask — scoped with Brian before work starts.
Used for engineer clarification, cost-savings ALT plays, and package coordination.
Not a free stamp promise — scope and deliverables are confirmed before drawing work proceeds.
What you get
ALT / fit drawing style
- Matches the exact original plan sheet format
- New equipment only — old BOD equipment fully removed (no whiteout)
- Boiler placed per manufacturer IOM
- Piping shown connected to finals on the new unit
- Flue included on the exhibit
- Clearances and KEY / notes stay off the drawing (companion memo)
What to upload
Plans & schedules
- Floor plan and / or mechanical room plan (PDF preferred)
- Div 23 equipment schedules / BOD list
- Relevant cut sheets or manufacturer model if already selected
- Project name, location, and need-by date when you can
How to request: Use the RFQ form and set Interest type to
Equipment room layout / fit drawings. Attach plans in the mail app after it opens.
Brian confirms scope (GO) before layout work starts.
Back to hub options →